R. FAHRZEUGBAU: ALUMINIUM WELDERS FOR BODY SHELL PRODUCTION DURING RAMP-UP
Additional capacity for takt-based aluminium assemblies under high quality requirements
Overview

The challenge
Initial situation: The ramp-up of a new series significantly increased demand for qualified aluminium welding staff.
Bottleneck: The internal team could not cover takt production peaks and rework in parallel.
Quality requirement: Repeatable execution, clean documentation and reliable integration into the serial logic were decisive.
Project risk: Missing capacity would have led directly to takt losses in body-shell production.
Our approach
Detailed intake: Assemblies, material thicknesses, takt sequences and shift demand were analysed jointly in advance.
Targeted qualification match: Only aluminium welders with experience in serial manufacturing environments were deployed.
Clean line integration: The team was integrated in line with takt, sequence and handover points within production.
Ongoing adjustment: Close exchange with production management and work preparation ensured fast reactions to changes.

Measured results
The client stabilised the serial ramp-up without shifting bottlenecks to other lines. The key strength was the rapid integration into a takt-based production environment.

Are you facing a similar challenge?
More case studies

F. STAHLTECHNIK: 3 TIG WELDERS FOR HALL CONSTRUCTION IN 72 HOURS

M. SYSTEMS: 4 TIG WELDERS FOR PROTOTYPE FABRICATION IN 5 DAYS

PETROLINE: 5 PIPE WELDERS FOR A 9-DAY PLANT SHUTDOWN

P. DEF.: 8 WELDERS SUPPORTING AN ONGOING SERIAL PROGRAM

N. WERFTTECHNIK: 6 MAG WELDERS FOR SECTION FABRICATION

P. EDELSTAHLTECHNIK: 2 TIG PIPE WELDERS IN 48 HOURS